Your Status: Logged out Log in

Explain and critically examine the reasons why the Joint Contractual Tribunal 1998 has been amended from its original publication.  

Member rating: No Rating | Words: | Submitted: Wed Mar 10 2004

Page Preview
Preview
Previous 1 of 10 Next

On the left is an image preview of every page of this document, and below are the first 150 words with formatting removed:

Contractual Procedures II Assignment 1 JCT 98, Amendments 1. Introduction 1.1 This report has been written, to explain and critically examine the reasons why the Joint Contractual Tribunal 1998 has been amended from its original publication. 1.2 Since the Joint Contractual Tribunal issued the Standard Form of Building Contract, 1998 Edition, it has been amended 5 times with new clauses and sundry amendments. 1.3 The amendments have been brought out annually since the Joint Contractual Tribunal issued the Standard Form of Building Contract, 1998 Edition was introduced. 1.4 In brief the amendments are as follows. a) Amendment 1, June 1999 - Construction Industry Scheme (CIS) b) Amendment 2 & Guidance notes, January 2000 - This amendment relates to the Contracts (Rights of Parties) Act 1999; Interim Certificates; Adjudication and Contribution, levy and tax fluctuations. c) Amendment 3, January 2001 - Terrorism cover/Joint Fire Code/Standard Method of Measurement d) Amendment 4, January 2002- Amendment covering extensions of time/loss and expense/advance payment e)...

To see the full version of this document, and 145,328 others

Register Now