Outline tendering techniques used by estimators and surveyors when bidding for a construction job that is faced with a different aspect, which is built into the price e.g. a project being constructed in a heavily built up congested area.
Member rating: No Rating | Words: | Submitted: Wed Mar 10 2004
On the left is an image preview of every page of this document, and below are the first 150 words with formatting removed:
Introduction 1.1 The content of this report is to outline tendering techniques used by estimators and surveyors when bidding for a construction job that is faced with a different aspect, which is built into the price e.g. a project being constructed in a heavily built up congested area. 1.2 Assumptions that are made for the purpose of this project: a) Assuming I am taking the roll of senior estimator for a general contracting firm. b) We are bidding for the construction of a large commercial project, situated in a city notorious for its narrow streets and heavily built-up areas. c) I am going to assume that the commercial project is the development of the Bullring Shopping Centre situated in the middle of Birmingham city. 1.3 Some information on the background to the project that is being tender for: At present times Birmingham city is taking major transformation to give it a world-class reputation, the Bullring development is...

