Process control at Polaroid.
Member rating:
(1 vote)
| Words:
| Submitted: Fri Jan 28 2005
On the left is an image preview of every page of this document, and below are the first 150 words with formatting removed:
PROCESS CONTROL AT POLAROID (A) SITUATIONAL ANALYSIS Project Greenlight: Polaroid's R2 factory at Waltham, Massachusetts manufactures integral film. Project Greenlight, an initiative to make quality control process more effective, has been introduced at the R2 building of Polaroid during the first six months of 1985. The Project aims to reduce quality-monitoring costs while maintaining or even improving upon the present level of product quality. The conceptualizers of the Project, George Murray and Joe O Leary, hoped to devise a method to make quality control process more effective, beyond merely reducing the number of samples taken. Project Greenlight had three key elements. * Statistical process control principles would be adopted: processes in control and capable of producing within specifications would produce more consistent quality. * Production operators would be given the process control tools that the process-engineering technicians had been using and, in conjunction with sampling, would be expected to make disposition decisions themselves. * Quality control...

