Your Status: Logged out Log in

A case study of the UK flooding: the river Uck, East Sussex, October 2000

Member rating: No Rating | Words: 1215 | Submitted: Sat Dec 15 2007

Page Preview
Preview
Previous 1 of 6 Next

On the left is an image preview of every page of this document, and below are the first 150 words with formatting removed:

A case study of the UK flooding: the river Uck, East Sussex, October 2000 During the wet season of October the Sussex the Uck-Ouse basin burst it banks and caused major flooding in the surrounding towns mainly a small town called Uckfield. Upstream of the town of Uckfield slopes are very steep and so runoff happens very quickly after rainfall. However the River Uck flood plain is relatively undeveloped, with natural flood plains remaining. Here land management practices are well adapted to flooding. The flooding in the central part of the Ouse catchments on Thursday 12th October 2000 was preceded by 3 days of storms and heavy rain across the whole area. The ground became increasingly waterlogged, and there was widespread, localised flooding from surface water run-off. Uckfield flooded dramatically from about 5.00am on the 12th October, with river levels rising rapidly to a peak between 9.00am and 10.00am, at...

Get instant access



  • Instant, unlimited access to our documents in full
  • Swap your work for free access, or pay £4.99
  • To see the full version of this document and 150,044 others
Register Now