D H W – 1 INSTALL HOT WATER SYSTEMS & COMPONENTS
Member rating: No Rating | Words: | Submitted: Thu Dec 15 2005
On the left is an image preview of every page of this document, and below are the first 150 words with formatting removed:
D H W - 1 INSTALL HOT WATER SYSTEMS & COMPONENTS Pound lane Marlow 1) There were no anticipated delays to know off except for materials /sanitary ware not arriving on time or arriving damaged, but the retailers assured me that the materials would arrive on time. 2) I ensured the cylinder sits in the space provided; I checked the size of the cylinder is adequate for the customer's requirements and to any future developments. I ensure all hot water outlets are currently working properly. I checked size of cylinder vent which is 22mm and discharging over tank. 3) The cold feed to the cylinder is 22mm which is adequate to supply the hot outlets. A 225 litres (50 gallons) storage cistern which is suitable and is also situated above the cylinder. 4) I checked with the customer that they were happy with the plans and sizing of the hot water cylinder. 5) Information on the job was...

