Your Status: Logged out Log in

Use of IT tools in Road Management and Engineering.  

Member rating: No Rating | Words: | Submitted: Mon Mar 22 2004

Page Preview
Preview
Previous 1 of 12 Next

On the left is an image preview of every page of this document, and below are the first 150 words with formatting removed:

Use of IT tools in Road Management and Engineering by Raymond Au Abstract The report presents the use of IT tools in the road management and engineering area. IT tools used in the road management and engineering area is the main approach worldwide. It can save time, cost, labor force and also perform some works that human may not be able to accomplish. HDM-4 and ARCADY are typical examples of computer programmes. HDM-4 aims at assisting engineers in predicting the future economic, technical, social and environmental outcomes of possible investment decisions concerning road assets. It provide assessments of the economic and environmental impact of investment choices and consider new development works, maintenance works and improvement works as possible investment choices. ARCADY can assist engineers in predicting accident rates in existing roundabouts and designing new roundabouts at an ordinary intersection. It can save much precious time for engineers in geometric design in avoiding iterations...

Get instant access



  • Instant, unlimited access to our documents in full
  • Swap your work for free access, or pay £4.99
  • To see the full version of this document and 151,713 others
Register Now